EASY USE & RAPID APPLICATION


- Spray-on area to be strengthened
- No additional tack or seal-coat needed
- Hardening starts immediately
- Ready for service in 30 mins or less
- Clean-up and storage is easy


BENEFITS

- Passed 325 PSI-35,000 LBS F-15 Landing Strength Test
- Limited warranty (w/ Group HI Service Agreement)
- Cost-effective
- Treated asphalt area is ready for use in 30 mins or less
 - Broad climate range
- Eight-test sites in three states & 4-years later – no failures

CHALLENGES DEFINED

Airfield asphalt pavement joints are vulnerable to failure due to heavy usage.

SOLUTION:  ART is many times stronger than 12-months cured asphalt in minutes not months.

Military aircraft generate over 260°C exhaust heat which causes asphalt to turn to a sticky-liquid and can break-off in small pieces.


SOLUTION: ART remains solid up to 439°C.  Concrete spalling occurs between 93--204°C.

Group HI
Asphalt Preservation &
Strengthening Contractor